1. Building base loads 2. Perform regular energy analysis and data collection 3. Conduct on-site inspection and investigation to eliminate invalid energy consumption 4. Update base load 5. Analyze the energy consumption of major production facilities and utilities 6. Apply improvement, innovated technology to the existing equipment 7. Conduct regular energy audits and communicate with all relevant parties Zhunyun consultants can also use simulation software to conduct sensitivity analysis to identify the optimum operation point. |